 |
| |
SQURTS
project
Trentec is constantly striving to maximize the seismic testing efficiency by utilizing the most current technologies and streamlining our processes. SQURTS (Seismic QUalification Reporting and Testing Standardization) is a program administered by EPRI that performs collaborative seismic testing for nuclear utilities. Trentec has partnered with EPRI and the utilities to standardize seismic test methods & reports and share the seismic test results & experience.
Trentec has been the contractor for the EPRI SQURTS Program since the first seismic test in May 1993 and has tested over 2,000 items and generated over 250 reports. A seismic test schedule is established at the start of the year and a SQURTS seismic test is performed at Trentec every six weeks. The seismic testing cost is controlled by testing a group of items together instead of each item individually. Following test completion, results are loaded into a database that is available for SQURTS members to search. Trentec’s “can do” attitude; dedication to SQURTS program, and positive relationship with the Utilities and EPRI have all contributed to the success of the SQURTS program.
Jump to SQURTS Project Page
|
|
EPRI SQURTS 2008 TEST SCHEDULE |
|
S |
M |
T |
W |
T |
F |
S |
S |
M |
T |
W |
T |
F |
S |
S |
M |
T |
W |
T |
F |
S |
|
JANUARY |
FEBRUARY |
MARCH |
|
|
|
1 |
2 |
3 |
4 |
5 |
|
|
|
|
|
1 |
2 |
|
|
|
|
|
|
1 |
|
6 |
7 |
8 |
9 |
10 |
11 |
12 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
|
13 |
14 |
15 |
16 |
17 |
18 |
19 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
|
20 |
21 |
22 |
23 |
24 |
25 |
26 |
17 |
18 |
19 |
20 |
21 |
22 |
23 |
16 |
17 |
18 |
19 |
20 |
21 |
22 |
|
27 |
28 |
29 |
30 |
31 |
|
|
24 |
25 |
26 |
27 |
28 |
29 |
|
23 |
24 |
25 |
26 |
27 |
28 |
29 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
30 |
31 |
|
|
|
|
|
|
APRIL |
MAY |
JUNE |
|
|
|
1 |
2 |
3 |
4 |
5 |
|
|
|
|
1 |
2 |
3 |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
|
6 |
7 |
8 |
9 |
10 |
11 |
12 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
|
13 |
14 |
15 |
16 |
17 |
18 |
19 |
11 |
12 |
13 |
14 |
15 |
16 |
17 |
15 |
16 |
17 |
18 |
19 |
20 |
21 |
|
20 |
21 |
22 |
23 |
24 |
25 |
26 |
18 |
19 |
20 |
21 |
22 |
23 |
24 |
22 |
23 |
24 |
25 |
26 |
27 |
28 |
|
27 |
28 |
29 |
30 |
|
|
|
25 |
26 |
27 |
28 |
29 |
30 |
31 |
29 |
30 |
|
|
|
|
|
|
JULY |
AUGUST |
SEPTEMBER |
|
|
|
1 |
2 |
3 |
4 |
5 |
|
|
|
|
|
1 |
2 |
|
1 |
2 |
3 |
4 |
5 |
6 |
|
6 |
7 |
8 |
9 |
10 |
11 |
12 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
|
13 |
14 |
15 |
16 |
17 |
18 |
19 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
14 |
15 |
16 |
17 |
18 |
19 |
20 |
|
20 |
21 |
22 |
23 |
24 |
25 |
26 |
17 |
18 |
19 |
20 |
21 |
22 |
23 |
21 |
22 |
23 |
24 |
25 |
26 |
27 |
|
27 |
28 |
29 |
30 |
31 |
|
|
24 |
25 |
26 |
27 |
28 |
29 |
30 |
28 |
29 |
30 |
|
|
|
|
|
|
|
|
|
|
|
|
31 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
OCTOBER |
NOVEMBER |
DECEMBER |
|
|
|
|
1 |
2 |
3 |
4 |
|
|
|
|
|
|
1 |
|
1 |
2 |
3 |
4 |
5 |
6 |
|
5 |
6 |
7 |
8 |
9 |
10 |
11 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
|
12 |
13 |
14 |
15 |
16 |
17 |
18 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
14 |
15 |
16 |
17 |
18 |
19 |
20 |
|
19 |
20 |
21 |
22 |
23 |
24 |
25 |
16 |
17 |
18 |
19 |
20 |
21 |
22 |
21 |
22 |
23 |
24 |
25 |
26 |
27 |
|
26 |
27 |
28 |
29 |
30 |
31 |
|
23 |
24 |
25 |
26 |
27 |
28 |
29 |
28 |
29 |
30 |
31 |
|
|
|
|
|
|
|
|
|
|
|
30 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
| To
request additional or more specific information, please
click here to use our Request Info Form, or phone us
at (513) 528-7900 , Fax: (513) 528-9292.
|
|
 |
| Engineering, manufacturing and installation |
 |
| Equipment Qualification Services |
 |
| Seismic Qualification |
 |
| Environmental Qualification |
 |
| EPRI/SQURTS Program |
 |
| Nuclear Facility Replacement Parts and Services |
 |
| Concrete Cutting |
| |
|
 |